Used parts and their characteristics



Characteristics of the impeller with engine:

Motor: ADH300L

Impeller: 50 mm with 8-blade propeller

Test data:

At 10 V

Current: 21 A

Thrust: 337.93 g (11.92 ounces)

Power consumption: 210 W

 

At 11.1 V

Current: 24 A

Thrust: 386.12 g (13.62 ounces)

Power: 266.4 W

 

At 12.6 V

Current: 28 A

Thrust: 479.96 g (16.93 ounces)

Power: 352.8 W

Characteristics of the Power Supply LINKWORLD LW2-350W (LPE) case:

ATX; power supply MB and CPU: 24 + 4 pin; power to the video card: none; Molex connectors: 2pcs; SATA connectors: 2pcs; network cable included

 

General characteristics

Form Factor: ATX

Power consumption: 350 W

Connectors

Power supply of the motherboard and processor: 24 + 4 pin

Length of power lines MP: 320 mm

Video Card Power: None

Connectors Peripheral (Molex): 2 pcs.

SATA connectors: 2 pcs.

Connectors for FDD: 1 pcs.

Cooling

The size of the fan (s): 80mm

Number of fans: one

Package and dimensions

Dimensions (WxHxD): 150 x 86 x 140 mm

Network cable included: yes

Delivery type: retail

Speed controller characteristics:

Braking system: off

Battery: LiPo Auto Detect

Low voltage: 3.2V (power off engine)

 

Speculation

Maximum motor current: 45A

Max BEC: 3A

BEC Voltage: 5.5V

LiPo: 2 ~ 6S

Nickel-Metal Hydride: 5 ~ 12cells

Weight: 31grams

 

Programming parameters.

Battery Type

Fast forward / backward

Soft Start

LV Installation (Ignore, reduce power, stop engine)

Timing (Auto, Med, High)

Switching (8,16kHz)

Restore factory settings

 

Light sensor module based on photoresistor. The amount of illumination at which the sensor operates is controlled by a trimmer.

 

 

 

 

Laser pointer characteristics:

Power: 0.5

Number of lamps: 1

Battery: LR41

Number of el. Power supply: 1

 

Team of the project

The composition of the project team shall be approved for the duration of the project work. Ingredients may vary only by agreement of both parties signed the document.

In business plan we have noted, if a participant or participants, for some reasons the team cannot continue in the project, this fact is recorded in the "Changes" section and shall be signed by the responsible persons.

Unfortunately one of the members of the team has stopped participating in the project for some personal reasons. All the work related to the assembly and programming was performed by the team of 4 people

 

Fullname: Participating
Krasovsky Dmitry Until 21.12.17
NiyazovVladislav Until 21.12.17
Emelin Roman Until 21.12.17
Rybova Anastasia Until 24.11.17
Osyagina Ekaterina Until 21.12.17

How to connect with us

Mail:osyaginakate@gmail.com

Phone number: +79816895923

Official group: https://vk.com/toptau

 

 

 

 

Project Indicators

Figure 12  Project scopes

The project as all projects in our Universe has three types of scopes (figure 12).

- Budget

Project budget amount to 100 EUR. The souse of financing is money allocation from L. S. Chechurin (Appendix 1). In accordance with financial report (X. Financial report) project cost is about 30 EUR. It means that the project was developed in budget scopes.

- Time

In accordance with project deadlines provided by L. S.Chechurin the project duration should be about 13 weeks. The project was made for 12 weeks. The distribution of spent hours is represented below.

- Context

The distribution of responsibilities for the project, including the executor, is shown in the table below.

Every typical project includes 4 stages:

· Project initialization (generation of ideas, choice of ideas, development of a patent)

· Planning (development of a plan, budget, search for necessary materials, risk assessment)

· Implementation (purchase of parts, generation of implementation options, design, programming, assembly) 

· Closing (testing of the system, preparation of financial statements and final presentation)

Below you can see the table which is showing the terms for the continuation of each stage, the estimated and actual duration.

*duration estimated approximately

 

The diagram of spent hours by project stages is represented at the figure 13.

Figure 13.Duration of stages

Spent hours were fixed in time sheets .All teammates has the personal list divided by weeks where he or she should record all tasks made during a week and time spent for these tasks. More than that, everybody tried to estimate planned duration of different tasks. The estimate is approximate.

 

Figure 14. Personal time costs

Project (summary) plan-fact analysis is represented at the figure 15.

 

 

Figure 15.Summary time cost

As we can see at the figure 15, it was spent about 205 hours for the project. These hours include two types of works shown in the table below.

 